Study: hostel
In collaboration with Tom Frantzen (Frantzen et al) we conducted a feasibility study into the transformation of an old factory building into a hostel with 125 prefabricated wooden rooms and adjacent facilities for staff, clients and visitors. We’re awaiting a follow-up.
On site: KBF atrium
The steel construction the KBF Atrium has been assembled on site. Fits like a glove!
New office space
Our new office space in De Kauwgomballenfabriek is taking shape. The former Maple Leaf factory and later artist studios are currently transformed into a light and open office space. We’re expecting moving in by July.
New project: Fluor
We have been commissioned by Dura Vermeer to join the design team for the infill of the new urban plan for Haarlem Schalkwijk Midden. The ambition is to create a ‘city between the trees’ that offers a quiet, green and low traffic residential environment. Our commission includes 42 apartments, 9 single family houses and 4 duplex lofts.