Update: Delta WFC
It has been quiet for quite awhile, but our project ‘Gebouw Delta‘ on the World Food Center in Ede has been revived. The building will be rented out in smaller flexible units with shared meeting rooms, coffee-bar and other services. We are currently redesigning the common spaces and will be resubmitting the building permit soon. Start of construction is planned for the second quarter of 2027.
Update: Koffiefabriek
Just before the summer holiday the social and mid rent apartments were finished and the first tenants moved in immediately. Over the last few months allot happened on site. The WasteBasedSlips applied to the facade of the plinth, recycled paving placed in the garage, the gardens installed and last but not least the name of the building placed above the main entrance gate. Made by the youngest carpenter student of contractor Vink Bouw. Visit the updated project page.
Update: Strandeiland
Recently the sales have started of the houses we designed for AM on Strandeiland in Amsterdam IJburg. Branded as ‘Tuinkwartier’, the entire project consists of four clusters of buildings. In the MEESVISSER designed cluster Duintuin, 33 timber townhouses and 34 apartments are now for sale on this website.
Update: Gedempte Gracht Zaandam
After a delay in the development due to doubts about the prefabricated modular building system, we recently completed the preliminary design for the 20 apartments around a small courtyard in the center of Zaandam. Read more on the project page.
Update: Elzenhagen NN1
We submitted the building permit for Elzenhagen NN1. The project is designed in collaboration with Aarons & Gelauf and WE architecten, with each architect responsible for several smaller clusters of single family houses. More information can be found on the new project page.
Update: Strandeiland
After an intense phase of designing, coordinating and negotiating, the detail design of plot M2B on Strandeiland has been delivered. High ambitions on sustainability and architectural quality demand a high level of integration. We are now continuing with the application of the building permit. See more on the project page.
New Project: Hoofddorp
We won the architects selection by Be Orange Real Estate and Nelson for the redevelopment of a former industrial/office plot in Hoofddorp. More information will follow.
Update: Koffiefabriek
At the Koffiefabriek, the first Fraké-noir wooden facade cladding elements have been placed. For the first time we’re seeing the final appearance of the building. The first inhabitants of the building might not be humans but rather the common swift, whose nests have been built into the facade.
Update: Wijck Pijnacker
Phase 1 of Wijck Pijnacker is almost complete. Phase 2 has started and phase 3 is planned to start in the forst quarter of 2026.
Update: Koffiefabriek
By placing the last CLT roof slab on top of the elevator core, the Koffiefabriek has reached its highest point!