On site: Leeuwesteyn
Celebration: in Leeuwesteyn the last prefabricated modules have been placed of the circular single family houses based on the technology of Sustainer. All future residents got to see their homes for the first time. For us this marks the first of a range of bio-based projects that finally materialise..
New project: Aeres MBO
We’re exited to share that we started work on a new school building for Aeres MBO in Ede. Actually this is a transformation of the design of two yet unbuilt office buildings we designed earlier. The school’s ambitious goals in sustainability align perfectly with the existing bio-based design and the food-theme of the WFC-development.
Update: WijCK Pijnacker
By revealing the ‘WijCK-Mus’ by minister of housing Hugo de Jonge, the official start of construction of this new neighbourhood was celebrated. Designed by Streetart Frankey, this sculpture of a sparrow symbolises the ultimate feeling of ‘home’ for both animals and humans.
Completed: Coffeeshop Noord
After a long process of renovating the whole building, the interior for Coffeeshop Noord has been completed. In this newest branch of Amsterdam Genetics resellers, the brand identity’s material palette of oak, marble, brass and mirror creates a bright and intimate experience.
Update: Koffiefabriek
After a year of intensively (re-)engineering the design, we have finally submitted the building application of this ambitious circular building. The balancing act it takes to design truly sustainable buildings, taught us allot about cooperation, flexibility and persistence. Ground breaking is planned Q3 of 2024.